Are you eager to reduce your VRF System Maintenance Cost, including VRF AC Gas Charges? You’re in the right place. Acservicebd.com offers expert AC technicians for VRF System Maintenance Services in Dhaka City and beyond. Our professionals ensure top-notch maintenance with the lowest VRF System Maintenance Cost, encompassing transparent VRF AC Gas Charges. Compare our pricing below to discover unmatched value for your HVAC maintenance needs. Trust us for excellence at the most affordable rates.

S.L
Description
Unit
Price(tk)
01
Indoor Unit Fitting Charges (1 Ton to 5 Ton)
01 Pcs
1,500/-
02
Outdoor Base & Rubber Pad Fitting (Outdoor Loading & Unloading for Company)
01 Pcs
2,000/-
03
Y Joint (Refnet) Fitting
01 Pcs
500/-
04
Wire Remote Fitting
01 Pcs
150/-
05
Suction Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
100/-
06
Discharge Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
90/-
07
Power Line Collection Indoor Unit
01 Pcs
150/-
08
Power Line Collection Outdoor Unit
01 Pcs
1,000/-
09
Communication Cable
01 Rft
15/-
10
Drain Pipe Installation
01 Rft
15/-
11
Drain Pipe Conceal Installation
01 Rft
150/-
12
Glass Hole Installation
01 Rft
20/-
13
Fuel Tape Installation
01 Rft
15/-
14
Vacuum
01 Unit
3,000/-
15
Commissioning Charge
01 Unit
4,000/-
S.L
Description
Unit
Price(tk)
01
Indoor Unit Fitting Charges (1 Ton to 5 Ton)
01 Pcs
1,800/-
02
Outdoor Base & Rubber Pad Fitting (Outdoor Loading & Unloading for Company)
01 Pcs
2,200/-
03
Y Joint (Refnet) Fitting
01 Pcs
600/-
04
Wire Remote Fitting
01 Pcs
170/-
05
Suction Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
120/-
06
Discharge Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
110/-
07
Power Line Collection Indoor Unit
01 Pcs
180/-
08
Power Line Collection Outdoor Unit
01 Pcs
1,200/-
09
Communication Cable
01 Rft
17/-
10
Drain Pipe Installation
01 Rft
17/-
11
Drain Pipe Conceal Installation
01 Rft
170/-
12
Glass Hole Installation
01 Rft
22/-
13
Fuel Tape Installation
01 Rft
17/-
14
Vacuum
01 Unit
3,500/-
15
Commissioning Charge
01 Unit
4,500/-
S.L
Description
Unit
Price(tk)
01
VRF AC Installation (Package)
01 Ton
2,500/-
S.L
Description
Unit
Price(tk)
01
VRF AC Installation (Package)
01 Ton
3,200/-

Noted:

01. Above mentioned rate/quotations will be applicable for only the area of Dhaka city without VAT&TAX.

S.L
Description
Unit
Price(tk)
01
Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
1,500/-
02
Servicing per Outdoor Unit
01 Pcs
2,500/-
03
Overhauling Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
2,500/-
S.L
Description
Unit
Price(tk)
01
Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
2,500/-
02
Servicing per Outdoor Unit
01 Pcs
3,000/-
03
Overhauling Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
3,000/-

Noted:

1. If you need an extra copper pipe after 10 feet of copper pipe, then the customer is required to pay an additional 350tk (three hundred and fifty) taka fer running feet copper pipe.

2. This Price is without VAT & TAX.

S.L
Description
Unit
Price(tk)
01
Lick Repair
01 Unit
10,000/-
02
Vacuum & Gas Charge
01 Unit
15,000/-
03
Indoor Unit PCB Board Change
01 Pcs
10,000/-
04
Outdoor Unit PCB Board Change
01 Pcs
15,000/-
05
Indoor Unit & Outdoor Unit Fan Motor Open & Installation
01 Pcs
10,000/-
06
Commissioning Charge Per Project(Maximum 100 ton)
01 Project
15,000/-
07
Minimum Service Charge (Machine Checking)
01 Unit
8,000/-
S.L
Description
Unit
Price(tk)
01
Lick Repair
01 Unit
20,000/-
02
Vacuum & Gas Charge
01 Unit
20,000/-
03
Indoor Unit PCB Board Change
01 Pcs
20,000/-
04
Outdoor Unit PCB Board Change
01 Pcs
25,000/-
05
Indoor Unit & Outdoor Unit Fan Motor Open & Installation
01 Pcs
20,000/-
06
Commissioning Charge Per Project(Maximum 100 ton)
01 Project
25,000/-
07
Minimum Service Charge (Machine Checking)
01 Unit
20,000/-

Noted:

1. If you need an extra copper pipe after 10 feet of copper pipe, then the customer is required to pay an additional 350tk (three hundred and fifty) taka fer running feet copper pipe.

2. This Price is without VAT & TAX.

Why are VRF AC Gas Charges different?

  • Refrigerant Type: Different VRF systems may employ different refrigerants with unique qualities and costs, contributing to gas charge variances.

  • Dimensions of the System: The amount of refrigerant required is affected by the size and capacity of the VRF AC system, with larger systems requiring more gas and consequently incurring more significant charges.

  • Energy Efficiency Ratings: Systems with better energy efficiency ratings may use specialized, typically more expensive, refrigerants to improve performance and environmental sustainability.

  • Model and manufacturer: The brand and model of the VRF system might affect petrol expenses because certain manufacturers may use proprietary refrigerants or components that affect overall pricing.

  • Availability of Refrigerants: The market availability of specific refrigerants might have an impact on pricing. Due to scarcity, rare or phased-out refrigerants may incur more significant costs.

  • Environmental Regulations: Compliance with environmental requirements may lead to adopting newer, eco-friendly refrigerants with different pricing structures than older, phased-out choices.

  • Installation Difficulty: The complexity of installing the VRF system, including routing refrigerant lines and accessibility, might increase labor expenses and, as a result, overall gas rates.

  • Local Market Conditions: Regional variances in labor costs, market demand, and economic considerations can all lead to disparities in VRF AC gas charges from one region to the next.

  • System Age: Older VRF systems may require specialized refrigerants that are no longer widely utilized, potentially resulting in increased costs for procuring these older refrigerants.

  • Technician Expertise: The skill level and ability of the technician doing the gas charge can have an impact on expenses. Certified professionals may charge a premium for their specialized knowledge and expertise.

  • Maintenance Agreements: VRF systems covered by complete maintenance contracts may have price schemes for petrol charges, including discounts or bundled services that alter overall costs.

Note: For More Information Visit Our Other Website Ponnomela.com